Interiors

Allegis Group

1024 683 Engenium Group

Allegis Group

loor renovation of the Allegis Group corporate office. The project involved a full tenant fit-up of the 65,000 SF interior space over five separate phases.

The program for the renovated space included a reception area, open and closed office space, collaboration areas, closed conference rooms, a pantry and bar, IT closets, and restrooms.

Scope included:

  • Site survey and preparation of existing condition drawings.
  • Due diligence assessment and report summarizing systems and recommendations for resuse, modification, or replacement, with the goal of optimizing existing systems where possible.
  • Mechanical
    • Reuse of existing primary mechanical systems upstream of terminal units, and new ventilation air handling unit to support conference center.
    • Reconfiguration of thermal zoning to be consistent with tenant requirement. A thermal zone diagram of the space with color-coded zones and thermostat locations prepared after the renovation.
  • Electrical

    New interior lighting layouts and emergency power to IT closets.

  • Plumbing

    New plumbing at restrooms and pantry areas.

601 Massachusetts Ave

1024 576 Engenium Group

601 Massachusetts Ave

Engenium Group provided MEP services for this office space renovation, including two spec suite fit-ups (6,000 SF) on level 2, and renovations to the elevator lobbies and multi-tenant cooridors (2,000 SF) on levels 2 and 3.

  • Mechanical
    • New HVAC supply and return diffusers to serve each suite
    • Selection of new plumbing equipment and fixtures
  • Electrical
    • New lighting, outlets and switches to coordinate with new layout
    • Daylight controls for perimeter spaces
  • Plumbing
    • New plumbing equipment and fixtures

CACI Ashburn

1024 678 Engenium Group

CACI Ashburn

This project includes fit-out of 49,250 SF of existing office space. The previous space held 260 seats and was in need of a refresh. The renovation increased the seating capacity to 375 seats, with 10% closed office and 90% open office space.

  • Mechanical
    • Reuse of primary MEP systems with minor adjustments to distributions systems
    • Relocation of existing constant column rooftop air handling units
    • New dedicated IT room conditioning systems
  • Electrical
    • New lighting and lighting controls throughout the space
    • New fire alarm system including fire alarms control panels and fire alarm devices
  • Plumbing
    • Existing plumbing systems were extended to new fixtures