Our Work

Anne M. Goding Elementary School HVAC Replacement
Modernized HVAC and sprinkler systems at Anne M. Goding Elementary School with energy-efficient upgrades and smart building controls—completed during a tight summer construction window.

Project Details

58,200 SF
920 F St. NE Washington, DC 20002
D.C. Department of General Services D.C. Public Schools

Project Description

Project scope included replacing the existing HVAC system and designing the new automatic wet sprinkler system throughout the entire Anne M. Goding Elementary School facility. The building was originally built in 1959, and underwent significant renovation in 2004 that included replacing the exterior cladding, modernizing the HVAC system, and replacing interior finishes in the academic wing. Goding contains 58,200 SF of space, of which includes a 50,000 SF four-story classroom wing, a 3,400 SF multi-purpose room, and a 2,800 SF cafeteria. The project was delivered through a design-bid-build contract, and construction as performed during the late spring/summer of 2016.

  • Heat recovery VRF for heating and cooling the building.
  • DOAS unit for ventilating the building, to include an energy recovery device, supply fan, exhaust fan, air filtration, natural gas heating section, and direct expansion cooling coil with hot gas reheat.
  • Building Management System (BMS) to integrate with the new HVAC systems.
  • New LED lighting, dimmable controls, and daylighting sequences.

Related Work
Explore More From Engenium Group

View All Work